• slidebg1
    SIEMEX POWER
    GENERATION LTD.
    Power Plant
    Drop-out Fuse
    Lightning Arrestor
    HT Switchgear with VCB & LBS as per your requirement
    Distribution Transformer as per your requirement
    LT Switchgear as per your requirement
    PFI Plant as per your requirement
    Vacuum Circuit Breaker (VCB)
    Load Break Switch (LBS)
    Current Transformer (CT)
  • slidebg1
    A Sister Concern of SIEMEX Group
    Magnetic Contactor
    Thermal Overload Relay
    PF Capacitor Bank
    PF Regulator
    Proximity Switch
    Photocell etc
    Auto/Manual Change-over Switch
    Fire Fighting Control Panel
    Direct On Line (DOL) Starter
    Star-Delta Starter
    Variable Speed Motor Drive (Inverter)
    Power Busbar Trunking System
  • slidebg1
    We look forward to your inquiries.
    Power Plant up to 550KV
  • slidebg1
    SIEMEX POWER
    GENERATION LTD.
    Power Plant
    Drop-out Fuse
    Lightning Arrestor
    HT Switchgear with VCB & LBS as per your requirement
    Distribution Transformer as per your requirement
    LT Switchgear as per your requirement
    PFI Plant as per your requirement
    Vacuum Circuit Breaker (VCB)
    Load Break Switch (LBS)
    Current Transformer (CT)
  • slidebg1
    SIEMEX POWER
    GENERATION LTD.
    Power Plant
    Drop-out Fuse
    Lightning Arrestor
    HT Switchgear with VCB & LBS as per your requirement
    Distribution Transformer as per your requirement
    LT Switchgear as per your requirement
    PFI Plant as per your requirement
    Vacuum Circuit Breaker (VCB)
    Load Break Switch (LBS)
    Current Transformer (CT)

Welcome to Siemex Group

About Us

Siemex Power Generation Ltd. was established in the year 2004. It is one of the leading Manufacturer in Bangladesh.

Our Services

Short Delivery time to fulfill every customer’s requirement. Quick response on the basis of high quality

Products

Power Plant, Transformers, Medium & low voltage Switchgears, Panels for power distribution and Busbar Trunking Systems

Our Products

Our Services

Within 24 months from the date of commissioning or 18 months from the date of deliver

Technical support and guide for erection and commissioning by SIEMEX engineer

Short Delivery time to fulfill every customer’s requirement. Quick response

To be competitive without sacrificing quality and credibility. Excellent after sales services.

Customization of clients needs, Engineering Solutions, Quality Added Service.

Drawing Approval, Raw Material Collecting, Delivery to Site, Erection & Commissioning